Musings

Weekly progress update

  • Workbench
    • Still need to nail on the 1/4″ plywood…
  • MPCNC Build – (check v1engineering.com)
    • Still squaring table – making a torsion box for the top.
    • Conduit rails being cut to size
    • Assembly of sub-parts ongoing.
  • Storage area for the garage
    • Basic plan in place. –
    • Need to get rid of unused stuff first.
  • New desk for the old computer
    • Developing plans in Fusion 360
    • Really need a new computer… mine is 15 years old…
  • Next artwork: Working title is “Monument”
    • It’s in process already, form cut and assembled. Canvas panels being stitched in place.
    • Stand for the next piece designed in Fusion 360
  • Leatherwork
    • Tote
      • Pattern cut
      • Leather:
        • 5-6oz oil-tanned pebble grain brown cowhide
        • 1oz glazed black goat for liner.
    • Journal cover
      • Design complete for a 8×5.5 inch journal
        • Extra – making it parametric to allow auto sizing depending on the original journal size.
        • Pattern printed
        • Leather: 5oz veg-tan
    • Purse
      • Design about 80% complete in Fusion 360
      • Leather: 5oz veg-tan
  • Daughter’s Wedding Planning
    • Parametric designed trellis for my daughter… once her venue is set and the size of it is determined, I will just need to adjust the height and width… Fusion 360 should do the rest.

← Musings